Plantroom Refurbishment – Willingham P.S
This project involved a complete strip out of the existing school boiler room and installing 2 new wall mounted gas fired boilers, new calorifier and all associated plant & controls, the works took place during the summer shut down and were completed on time for the new term opening. The programme included a complete redecoration of the plantroom walls and floor and a new flue route had to be designed and installed to accommodate the new boiler installation. The project also included re-incorporating the school swimming pool pump and filtration plant. A new plantroom control panel was designed,built and installed for this project to enable the facility to have total control of the heating and hot water for the site.
Electrical Work:
- New Control Panel
- Plantroom Lighting
Mechanical:
- 2x Gas Fired Heating Boilers
- Hot Water Calorifer
- New Expansion Vessels
- Complete new flue
- All new pipeowrk
- 4x new pump sets
- System Power Flush
Client:
Cambridgeshire County Council
Architect:
Cambridgeshire County Council
Project Value:
£140,000
Consultant:
Cambridgeshire County Council
Main Contractor:
Eyre Group